Below are some of the projects we have completed over the years. Click on the pictures to see additional photos for each project.

 
Big Sand Wash Feeder Pipeline
 

Big Sand Wash Feeder Pipeline was a part of the Central Utah Water Project. It consisted of a 48" HDPE pipeline laid from the Lake Fork River bottom to Big Sand Wash. This project included various environmental concerns which were resolved as it was laid through the river bottom, private farm areas and grazing properties.

Prime Contractor - GW Johansen Construction
Engineer - Horrocks Engineering Dept. of Interior
View More Photos
 
Big Sand Wash Transmission Pipeline
 

Big Sand Wash Transmission Pipeline was constructed from Big Sand Wash to Roosevelt City. It is also part of the Central Utah Water Project consisting of a 32" solid welded steel, concrete lined and concrete coated pipeline. The pipeline is 20 miles long, traveling through farm land, pasture and city utilities and included many ground water challenges.

Prime Contractor - GW Johansen Construction
Engineer - Horrocks Engineering Dept. of Interior
View More Photos
 
Sand Hollow 54" Feeder Line
 

Sand Hollow Pipeline was completed for the Washington County WATER Conservancy District . The pipe was a gasketed, steel, 54" pipe which conveyed water from the hydro-electric plant near Hurricane to Sand Hollow Reservoir. The line was laid through difficult terrain including lava (basalt) and solid sand stone.

Prime Contractor - GW Johansen Construction
Engineer - Alpha Engineering
View More Photos
 
Sand Hollow Pump House
 

Sand Hollow Pump House and piping was built to increase pressure to fill Sand Hollow Reservoir. It consisted of a 5 stage pump system with 54" knife valve.

Prime Contractor - GW Johansen Construction
Engineer - Alpha Engineering
View More Photos
 
Big Water Subdivision
 

Big Water Subdivision was completed for SITLA (State Institution Trust Land Administration). It consisted of constructing lines for water, phone and power as well as a new road to service 23 potential lots.
View More Photos
 
Skyline Mine Portal Closures
 

Skyline Mine Portal Closures consisted of closing one side portal, reclaiming the side hill and the road entering the area and disassembling the mine's main portal. The work was done for Skyline Mine located in Schofield, Utah.
View More Photos
 
Fountain Green Fish Hatchery
 

Fountain Green Fish Hatchery was bid through the DFCM, with Valley Builders as the Construction Manager. We installed all piping for the buildings, raceways, degas structures, filter house and residential housing. Piping included a wide variety of pipe, ranging from 1" to 24" pipe.
View More Photos
 
Santa Clara 1 Million Gallon Tank and 20" Pipeline
 

Santa Clara 1 Million Gallon Tank and 20" Pipeline was completed for Santa Clara City with Sunrise Engineering as designers and Dale Cox Construction as the subcontractors. It consisted of a 1 million gallon concrete tank and a 12" thru 20" pipeline to town. Challenges for this project included crossing the Santa Clara River and extensive blasting for the tank and pipeline.

The blasting was done by 3 River Company.
View More Photos
 
Whiterocks Fish Hatchery
 

Whiterocks Fish Hatchery was bid through the DFCM with Valley Builders as Construction Manager. It consisted of a massive spring development and all onsite piping for buildings and raceways.
View More Photos
 
Blue Bell Connector Road
 

Blue Bell Connector Road was bid through the Utah Department of Transportation with Burdick Paving as the Prime Contractor and Horrocks Engineering as the Engineers. This job consisted of a new drain line, storm drain, irrigation mainline as well as new curb, gutter and sidewalks.
View More Photos
Home | TRB Rock Products | Company Info | Services | Projects | Photo Gallery | Contact Us